Dust Test Equipment
DT-1F / DT-2 / DT-1CF / DT-Z / DT-W
The Dust Test Equipment that tests the durability of in-vehicle parts such as automobile headlights, blinkers, speedometers, and electrical parts against dust. Supports various international standards such as SAE J575, ISO 20653, IEC 60529, IEC 60068-2-68 Lb, DIN 40050 (IP-Schutzarten), JIS D 0207, JIS D 5500, JIS D 5020, JIS C 0920, JSTM J 7602T.
Dust Test Equipment DT-1F / DT-2 / DT-1CF
Test standard : SAE J575, JIS D 0207, JIS D 5500
The Dust Test Equipment that tests the durability of in-vehicle parts such as automobile headlights, blinkers, speedometers, and electrical parts against dust.
- DT-1F complies with JIS D 0207, JIS D 5500 floating test.
- DT-2 complies with SAE J575 floating test.
- DT-1CF complies with JIS D 0207 floating test and airflow test.
Dust Test Equipment DT-Z
Test standard : ISO 20653, IEC 60529, JIS D 5020, JIS C 0920
Dust test to comply with IP Code (International Protection Code, which is regulated in IEC60529: Degrees of protection provided by enclosures)
DT-Z that tests the durability of in-vehicle electrical components and mobile products against dust. It has a device that vacuums the air inside, as well as dropping dust from the top of the test object, and the vacuum amount can be adjusted according to the test specimen.
Dust Test Equipment DT-Z
Test standard : IEC 60068-2-68 Lb
Large chamber to comply with IEC 60068-2-68 Lb
DT-Z which is capable of temperature and humidity adjustment before testing.
The floor is designed in a slatted shape to prevent dust from blowing off again during work, and the tank wall cleaning nozzle makes it easy to clean the upper part.
In addition, it is equipped with a heat exhaust device to exhaust the heat generated by the test object to the outside.
Dust Test Equipment Customization
Test standard : ISO 20653, JIS D 5020
Suspended Water Flow Pollution Acceleration Test Equipment DT-W
Test standard : JSTM J 7602T
DT-W reproduces and accelerates dirt on the outer walls of buildings.
The pollutant suspended water is poured onto the test specimen and then dried.
By repeating this, pollution is reproduced and accelerated.
In addition, we have DT-D type that sprays pollutants (carbon black) using a Weather Meter, and DT-DX type that sprays pollutants (carbon black) while irradiating light and raining.
Comparison of IP Code 1st Characteristic Number
IP Code | IEC 60529 (Degrees of protection provided by enclosures) |
DIN 40050 (IP-Schutzarten) | ISO 20653 (Road vehicles - Degrees of protection (IP-Code) Protection of electrical equipment foreign objects, water and access |
JIS D 5020 | ||||
---|---|---|---|---|---|---|---|---|
JIS C 0920 | ||||||||
IP5X | Dust | - | - | - | ||||
Although it is not possible to completely prevent the penetration of dust, there must be no penetration of dust in an amount that interferes with the prescribed operation and safety of electrical equipment. |
- | - | - | |||||
Category 1 | Category 2 | - | - | - | ||||
Vertical type, talc powder, internal negative pressure test |
Vertical type, talc powder | - | - | - | ||||
IP5KX | - | Dust | Dust | Dust | ||||
- | Dust shall not penetrate in an amount that interferes with the function and safety of electrical equipment. |
Dust shall only penetrate in quantities which do not impair performance and safety |
Dust shall not penetrate in an amount that interferes with the function and safety of electrical equipment. |
|||||
- | Vertical Type | Horizontal Type | Vertical Type | Horizontal Type | Vertical Type | Horizontal Type | ||
- | Portland cement + Fly ash 2kg/m³, Operation 6S, Stop for 15min, 20 times |
Portland cement + Fly ash 5g/m³, 1.5m/s |
Arizona dust A2 2kg/m³, Operation 6S, Stop for 15min, 20 times |
Arizona dust A2, 5g/m³, 1.5m/s |
Arizona dust A2 2kg/m³, Operation 6S, Stop for 15min, 20 times |
Arizona dust A2, 5g/m³, 1.5m/s | ||
IP6X | Dust | - | - | - | ||||
Dust shall not penetrate | - | - | - | |||||
Category 1 | Category 2 | - | - | - | ||||
Vertical type, talc powder, internal negative pressure test |
Vertical type, talc powder | - | - | - | ||||
IP6KX | - | Dust | Dust | Dust | ||||
- | Dust shall not penetrate | Dust shall not penetrate | Dust shall not penetrate | |||||
- | Vertical Type | Horizontal Type | Vertical Type | Horizontal Type | Vertical Type | Horizontal Type | ||
- | Portland cement + Fly ash 2kg/m³, Operation 6S, Stop for 15min, 20 times |
Portland cement + Fly ash 5g/m³, 1.5m/s |
Arizona dust A2, 2kg/m³, Operation 6S, Stop for 15min, 20 times |
Arizona dust A2, 5g/m³, 1.5m/s | Arizona dust A2, 2kg/m³, Operation 6S, Stop for 15min, 20 times |
Arizona dust A2, 5g/m³, 1.5m/s |